Maintenance Calendar
January
- Service vehicle entrance gates
- Deck inspection
February
- Gutter cleaning – greenbelt units
March
- Irrigation system – start up
- Exterior lighting – reset for daylight savings
- Swallow nests – notice to owners
- Roadway & yard sumps – clean out
April
- Stucco surfaces – repair damage
- 678/688 entry gates – paint
May
- Service vehicle entrance gates
- Window washing
- Shaughnessy & Mary Hill greenbelt – cutting
June
- Stucco & Fascia surfaces – clean grime & moss
- Exposed aggregate surfaces – power wash & seal (?)
July
- Wood surfaces & trim – repair as needed
- Facia board paint project – units 55 to 120
August
- Strata lot entrance doors – paint as needed
- Lamp posts – paint
September
- Service vehicle entrance gates
- Fire hydrant testing
- Sprinkler system testing – amenity bldg
- Deck inspection
- Window caulking inspection
- Dryer Vent cleaning
- Roof inspection and tile replacement
- Swallow nest removal and stucco cleaning
October
- Gutter cleaning – all units
- Irrigation system – winterization
- Ice melt – order
- Snow removal contract
- Furnaces, fireplaces – remind owners to service
November
- Gutter cleaning – greenbelt units.
- Exterior Lighting – reset to regular time
- Hose bibs – remind owners to winterize
- Shaughnessy & Mary Hill greenbelt – cuttings
- Downspouts – inspect all units and amenity bldg