Maintenance Calendar

January

  • Service vehicle entrance gates
  • Deck inspection

February

  • Gutter cleaning – greenbelt units

March

  • Irrigation system – start up
  • Exterior lighting – reset for daylight savings
  • Swallow nests – notice to owners
  • Roadway & yard sumps – clean out

April

  • Stucco surfaces – repair damage
  • 678/688 entry gates – paint

May

  • Service vehicle entrance gates
  • Window washing
  • Shaughnessy & Mary Hill greenbelt – cutting

June

  • Stucco & Fascia surfaces – clean grime & moss
  • Exposed aggregate surfaces – power wash & seal (?)

July

  • Wood surfaces & trim – repair as needed
  • Facia board paint project – units 55 to 120

August

  • Strata lot entrance doors – paint as needed
  • Lamp posts – paint

September

  • Service vehicle entrance gates
  • Fire hydrant testing
  • Sprinkler system testing – amenity bldg
  • Deck inspection
  • Window caulking inspection
  • Dryer Vent cleaning
  • Roof inspection and tile replacement
  • Swallow nest removal and stucco cleaning

October

  • Gutter cleaning – all units
  • Irrigation system – winterization
  • Ice melt – order
  • Snow removal contract
  • Furnaces, fireplaces – remind owners to service

November

  • Gutter cleaning – greenbelt units.
  • Exterior Lighting – reset to regular time
  • Hose bibs – remind owners to winterize
  • Shaughnessy & Mary Hill greenbelt – cuttings
  • Downspouts – inspect all units and amenity bldg